Desalination Project
Ionics RCC Trinidad |
We provided control system design, PLC programming, HMI interface and
Historical Database for an over 2000 field I/O Points, 26 VFD Drives
interfaces, and over 20 Electronic Relays system. With the following
communication protocols:
|
||||||||
|
Aluminum Paint Line
Signature Finishers |
We provided a PLC system upgrade from an old Texas Instruments PLC to a new
Allen-Bradley SLC5-04. This included demolition of old PLC & HMI,
installation, programming and commissioning of new PLC & HMI.
|
||||||||
|
Fine Grind Lime Facility
Florida Crushed Stone |
We provided control system design, PLC programming, HMI interface, and
commissioning for an over 200 field I/O Points and interface with burner
control package.
|
||||||||
|
Load Shedding System
Georgia-Pacific Corporation, Palatka Operations |
We provided control design, PLC programming, HMI interface, and commissioning
for monitoring and control of over thirty (30) 13.8kV and 4160V feeder,
generator, and bus tie breakers.
|
||||||||
|
New Coal Handling MCC Room
Georgia-Pacific Corporation, Cedar Springs Operations |
We provided control design, PLC program modifications, demolition of old remote
PLC chassis and commissioning of new remote PLC chassis.
|
||||||||
|
Ammonia Unloading, Storage,
cooling, & Pumping Facility Farmland Hydro L.P., |
We provided control design, PLC Programming, HMI interface, and commissioning for new and old MCC’s. A complete conversion from bench board controls to PLC and HMI automated control. |