This warm transformer bushing may have caused damage to the transformer temperature gage and concrete pad. Review of this fuse application is necessary along with the analysis of fuse holder connections and cable for damage.


The blockage of this motor’s cooling fins may be causing it to achieve such high temperatures. The review of the brick lining of this kiln is necessary to further inspect this heated area.